Mumbai’s Metro-3 gets its first tunnel
In a major milestone in the construction of the city’s first underground Metro corridor, the first tunnel of the 33.5-km Colaba-Bandra-Seepz (Metro-3 line) was completed on Monday.
Chief minister (CM) Devendra Fadnavis termed the breakthrough as a “historic” and “momentous” occasion.
The 1.26-km tunnel between Pali ground in Marol, Andheri (East) and the International airport terminal T2 was completed in 259 days.
All our articles are periodically updated.
TO LEAVE A COMMENT OR TO DISCUSS THIS ARTICLE
Join us on Facebook https://www.facebook.com/togethervcanmumbai
Follow us on Twitter https://twitter.com/together_vcan
Email us at citizens@togethervcan.in