Mumbai: 70% tunnelling work for Colaba-Seepz Metro done

Mumbai: The metro rail body, Mumbai Metro Rail Corporation, has achieved 70% of tunnelling work that is required for Colaba-Bandra-Seepz Metro-3 corridor.

The Colaba-Bandra-Seepz Metro -3 corridor is the first and only fully underground corridor for Mumbai.

https://timesofindia.indiatimes.com/city/mumbai/mumbai-70-tunnelling-work-for-colaba-seepz-metro-done/articleshow/72234282.cms

All our articles are periodically updated.