Mumbai to get two more Metro rail lines
The Mumbai Metropolitan Region Development Authority (MMRDA) will now float bids for construction of the 10.5-km Dahisar–Mira-Bhayander (Metro 9) corridor and 3.2-km Andheri-International airport (Terminal T2) (Metro 7A).
Out of the 3.2km, 2.11km will be underground and the station, too, will be underground, MMRDA officials said.
All our articles are periodically updated.
Pingback: myplay168
Pingback: faw99